10.2 MWH INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) POWER PLANT |
Document Number |
Document Name / Size |
Download |
Remarks / Notes |
1. LEGAL AND FINANCIAL DOCUMENTS OF XENERGI LIMITED (PROJECT COMPANY) |
XEN-0001-01 |
Certificate of Registration (541 KB) |
 |
This Certificate of Registration show that XENERGI is a duly registered and existing Company under the Laws of Nigeria |
XEN-0001-02 |
Form CAC2A - Distribution of Shares (673 KB) |
 |
Shares of the Company's initial and actual shareholders |
XEN-0001-03 |
Form CAC7 - Particulars of Directors (1.20 MB) |
 |
Particulars of the Company's initial and actual shareholders |
XEN-0001-04 |
Memorandum and Articles of Association (966 KB) |
 |
The Company legal statement signed by the shareholders, declaring the business portfolios, objectives and manners of external affairs |
XEN-0001-05 |
Shareholding Structure of Xenergi (80 KB) |
 |
The Sharholders shall secure the Equity Contribution of 15% of the Total Investment Capital and all related bank charges. |
XEN-0001-06 |
Profile of the Project Company - XENERGI (1.10 MB) |
 |
XENERGI's Profile (including Power and related businesses) - it ownes and operates its own Gas Processing Plant in Ebendo. |
2. CONSTRUCTION LAND DOCUMENTS AND LAND TITLE (CERTIFICATE OF OCCUPANCY) |
XEN-0002-01 |
Certificate of Occupancy with EFTZ's TDP (1.20 MB) |
 |
This is the CofO (of 403.562ha of land) for the construction of the EFTZ, including the 10.2MWh IGCC Power Plant. |
XEN-0002-02 |
Land Use of the Enpower Free Trade Zone (202 KB) |
 |
ENPOWER ENERGY LIMITED is licensed by the Nigeria Export Processing Zones Authority (NEPZA) under Enpower Free Trade Zone Company (EFTZMC) to develop, build, own and operate the EFTZ. |
XEN-0002-03 |
Construction Site TDP and Coordinates (663 KB) |
 |
The land area required for the contruction of the 10.2MWh IGCC Power Plant is 1.6 ha from the Total land of 55.65 ha. There is a provision of expanding this plant up to 60 MWh on 35.30 ha. The Remaining will used for green fuel production, as an alternative fuel supply, if neccessary. |
3. PROJECT ADMINISTRATION MANUAL (PAM) |
XEN-0003-01 |
Project Administration Manual - PAM (2.4 MB) |
 |
This PAM is designed to provide the key guidelines, road map, standards, policies and regulations for the bankable and financeable implementation of the Project.. |
4. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) |
XEN-0004-01 |
EIA - Interim Report ( KB) |
 |
XENERGI shall engage MESSRS ENVIRONMENTAL & HUMAN RESOURCES LTD to update this interim report. |
XEN-0004-02 |
EIA - Full Report ( KB) |
 |
MESSRS ENVIRONMENTAL & HUMAN RESOURCES LTD shall provide the full EIA report and submit to the FMENV for approval. |
5. TECHNOECOCOMIC STUDIES OF THE PROJECT - FULL DOCUMENTATION |
XENI-0005-01 |
Technoeconomic Study - Full Report (1.9 MB) |
 |
This technoeconomic study demonstrates that the XENERGI's 10MWh Integrated Gasification Power Plant is technoeconomically and environmentally viable, bankable and financeable. |
XEN-0005-02 |
ANNEXURE 01 - Condenser Design (88 KB) |
 |
This annexure provides the main design parameters of the Condenser, including the Energy and Mass Flows. |
XEN-0005-03 |
ANNEXURE 02 - Cooling System Design (91 KB) |
 |
This annexure provides the main design parameters of the high-quality Cooling System of the Plant, including the Mass Flow etc. |
XEN-0005-04 |
ANNEXURE 03 - Deaerator Design (84 KB) |
 |
This annexure provides the main design parameters of the Dearator. |
XEN-0005-05 |
ANNEXURE 04 - Steam Boiler Design ( 79 KB) |
 |
The Steam Boiler secures the quantity and quality of steam to spin the Steam Turbine. Additional steam is produced from gasification. |
XEN-0005-06 |
ANNEXURE 05 - Steam Turbine Design (89KB) |
 |
This Annexure consist of the Steam Turbine designs and sizing. It also includes the steam energy balance and mass flow calculation. |
XEN-0005-06 |
ANNEXURE 06 - Delivery of the 3 x Gensets (205 KB) |
 |
Annexure for the delivery of the delivery of the 3 x gensets and related services by IEI/MWM under FBO Bratislavia. the Cost, Insurance and Freight to Enugu are included in the Contingencies of 10% in order to minimize the Total Investment or Total Project Cost. |
XEN-0005-06 |
ANNEXURE 07 - EPC Cost of the Project (89KB) |
 |
Total EPC Cost of the Project for the 10MWh IGSC Power Plant and for the 10.20 MWh IGCC Power Plant.
|
XEN-0005-06 |
ANNEXURE 08 - Financial and Economic Analyses for the 10MWh IGSC Power Plant - Variant A (122 KB) |
 |
This financial and economic analyses is based on the Total Project Cost for the EPCM of the 3 x 3.333 MWh (10 MWh) IGSC Plant. |
XEN-0005-06 |
ANNEXURE 09 - Cash Flow Projection for the 10MWh IGSC Power Plant - Variant A (124 KB) |
 |
The Project Cash Flow for a period of 20 years, showing the Debt Principle Paid and Debt Principal Remaining, etc. |
XEN-0005-06 |
ANNEXURE 10 - Sensitivity Analyses - for the 10MWh IGSC Power Plant (198 KB) |
 |
Sensitivity analyses of the project financial and technoeconomic parameters (Capital Cost, Debt interest Rate, Fuel Cost, etc.) |
XEN-0005-06 |
ANNEXURE 11 - Sensitivity Analysis Diagrams for the 10MWh IGSC Power Plant (93 KB) |
 |
Sensitivity analysis Diagrams of the project technoeconmic data (Capital Cost, Fuel Cost, Debt interest Rate, Cost of Equity, etc.) |
XEN-0005-06 |
ANNEXURE 12 - Financial and Economic Analyses for the 13.50MWh IGCC Power Plant - Variant B (122 KB) |
 |
Financial and economic analyses based on the Total Project Cost for the EPCM of the 3 x 3.333+3,500 MWh (13.500 MWh) IGCC Plant. |
XEN-0005-06 |
ANNEXURE 13 - Cash Flow Projection for the 13.50MWh IGCC Power Plant - Variant A (124 KB) |
 |
Projected Cash Flow of the project for a period of 20 years, showing the Debt Principle Paid and Debt Principal Remaining, etc. |
XEN-0005-06 |
ANNEXURE 14 - Sensitivity Analyses for the 13.50MWh IGCC Power Plant - Variant B (198 KB) |
 |
Sensitivity analyses of the project financial and technoeconomic parameters (Capital Cost, Debt interest Rate, Fuel Cost, etc. |
XEN-0005-06 |
ANNEXURE 15 - Sensitivity Analysis Diagrams for the 13.50MWh IGCC Power Plant - Variant B (93 KB) |
 |
Sensitivity analysis Diagrams of the project technoeconmic data (Capital Cost, Fuel Cost, Debt interest Rate, Cost of Equity, etc.) |
6. DETAILED TECHNICAL DESIGNS OF THE POWER PLANT |
XEN-0006-01 |
PLANT EXTERIOR ARCHITECTURAL DESIGNS |
|
|
XEN-0006-01A |
Power Plant Top Right View (423 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Top Right View. |
XEN-0006-01B |
Power Plant Top Right View - Centre (368 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Top Centre Right View |
XEN-0006-01C |
Power Plant Top Right View (365 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Top Right View. |
XEN-0006-01D |
Power Plant Top Rear View (369 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Top Rear View . |
XEN-0006-01E |
Power Plant Top Rear View (Transfer Towers) (446 KB) |
 |
XENERGI's 10-60 MWh IGCC Plant – Rear View Transfer Towers. |
XEN-0006-01F |
Power Plant Water Tanks Top View (478 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Water Tanks Top View. |
XEN-0006-01G |
Power Plant Parking and Admin Building View (480 KB) |
 |
XENERGI's 10-60 MWh IGCC Plant – Parking & Admin Building View. |
XEN-0006-01H |
Power Plant – Cooling Water System View (419 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Cooling Water System. |
XEN-0006-01I |
Power Plant – Warehouse View (509 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Warehouse. |
XEN-0006-01J |
Power Plant – Main Substation View (498 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Main Substation. |
XEN-0006-01K |
Power Plant – Gas Storage Tanks View (439 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Gas Storage Tanks. |
XEN-0006-01L |
Power Plant – Water Storage Tanks View (438 KB) |
 |
XENERGI's 10-60 MWh IGCC Power Plant – Water Storage Tanks. |
XEN-0006-01M |
Plant Green Field with Poplar Gasification Fuel (448 KB) |
 |
XENERGI's 10-60 MWh IGCC's Green Field in an area of 55.65 ha. |
XEN-0006-02 |
ADMIN. BUILDING'S 1ST & 2ND FLOOR INTERIOR (10MWH) |
|
|
XEN-0006-02A |
Admin Building - Eatery (Ground Floor) (494 KB) |
 |
The Plant Admin. Building Eatery located at the Ground Floor - Left |
XEN-0006-02B |
Admin Building - Eatery (Ground Floor) (436 KB) |
 |
The Plant Admin. Building Eatery located at the Ground Floor - Right |
XEN-0006-02C |
Admin Building - Staff Office Prototype (263 KB) |
 |
The Staff Office Prototype in the Plant Admin. Building. |
XEN-0006-02D |
Admin Building - Managers Office Prototype (299 KB) |
 |
The Managers Office Prototype in the Plant Admin. Building. |
XEN-0006-02E |
Admin Building - Reception and Waiting Area (488 KB) |
 |
The Reception and Waiting Area in the Plant Admin. Building |
XEN-0006-02F |
Admin Building - Reception Desk (576 KB) |
 |
The Reception in front of the Administration Building Waiting Area. |
XEN-0006-02G |
Admin Building -Toilets (First Floor) (288 KB) |
 |
The Fiest Floor Toilets of the Admin. Building (also for visitors). |
XEN-0006-02H |
Admin Building -Toilets (Ground Floor) (288 KB) |
 |
The Ground Floor Toilets of the Admin. Building (also for visitors). |
XEN-0006-03 |
2D-DETAILED DESIGNS OF THE POWER PLANT |
|
|
XEN-0006-03A |
Master Plan (831 KB) |
 |
It shows the Constuction of the actual 10.2 MWh IGCC on 1.6 ha and the projeced Plan for the future expansion of the Power Plant up to 60 MWh. All phases shall be built on a total area of 10 ha max. |
XEN-0006-03B |
Construction Site Coordinates on Google Map (3.5 MB) |
 |
The Site Coordinates is herein defined on Google Map as a Location Map, showing other important structures around the site. |
XEN-0006-03C |
Administration Building Logitdinal Section (269 KB) |
 |
For the construction of the 10.20 MWh IGCC Power Plant, only the ground floor and the 1st floor of the Admin. Building shall be built with the provision of expansion up to the 4th Floor as shown here. |
XEN-0006-03D |
Administration Building - Ground Floor Plan (369 KB) |
 |
Ground Floor Plan of the Admin. Building (#10.20 MWh IGCC). |
XEN-0006-03E |
Administration Building - Full Ground Floor Plan (397 KB) |
 |
Full Ground Floor Plan of the Admin. Building (#10.20 MWh IGCC). |
XEN-0006-03F |
Administration Building - First Floor Plan (279 KB) |
 |
First Floor Plan of the Admin. Building (#10.20 MWh IGCC). |
XEN-0006-03G |
Administration Building - Full First Floor Plan (418 KB) |
 |
Full First Floor Plan of the Admin. Building (#10.20 MWh IGCC). |
XEN-0006-03H |
Administration Building - Second Floor Plan (267 KB) |
 |
Second Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03I |
Administration Building - Full Second Floor Plan (423 KB) |
 |
Full Second Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03J |
Administration Building - Third Floor Plan (268 KB) |
 |
Third Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03K |
Administration Building - Full Third Floor Plan (426 KB) |
 |
Full Third Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03L |
Administration Building - Fourth Floor Plan (267 KB) |
 |
Fourth Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03M |
Administration Building - Full Fourth Floor Plan (417 KB) |
 |
Full Fourth Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03N |
Power Plant Site Loayout - Combined Phases (598 KB) |
 |
Full Third Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-03O |
Power Plant Fll Site Loayout - Combined Phases (1 MB) |
 |
Full Third Floor Plan of the Admin. Building (#60 MWh IGCC). |
XEN-0006-02 |
GENSETS MWM TCG 2032 V12 |
|
|
XEN-0006-02A |
TCG 2032 V12 Gastrain / Gas Control Unit (490 KB) |
 |
Standardardised Dimensions and Specification of the Gastain. |
XEN-0006-02B |
TCG 2032 V12 Installation and Design Instruction (3 MB) |
 |
The full installation of the Genset and the Marelli Generator connected together, showing all the dimensions and tolerences. |
XEN-0006-02C |
TCG 2032 V12 Top View Base Plate-Unit 1 (513 KB) |
 |
Foundation design, specifications and standards with the concrete requirements of Unit 1. |
XEN-0006-02D |
TCG 2032 V12 Top View Base Plate-Unit 2 (290 KB) |
 |
Foundation design, specifications and standards with the concrete requirements of Unit 2. |
XEN-0006-02B |
TCG 2032 V12 Foundation Height & Reinforcement (1.1 MB) |
 |
Foundation Height anc concrete reinforcement calculated based on the local conditions |
XEN-0006-04 |
COOLING TOWERS |
|
|
XEN-0006-04A |
Cooling Towers With Basin (496 KB) |
 |
Our experts have accurately carried out the design studies based on which FAN shall manufacture the Cooling Towers (with basin). |
XEN-0006-04B |
Cooling Towers Without Basin (370 KB) |
 |
Our experts have accurately carried out the design studies based on which FAN shall manufacture the Cooling Towers (without basin). |
XEN-0006-05 |
ELECTRICAL SINGLE LINE DIAGRAM |
|
|
XEN-0006-05A |
Electric Single Line Diagram of the Power Plant (332 KB) |
 |
The Electrical Single Line Diagram of the Power Plant full capacity. |
7. PROJECT AGREEMENTS |
XEN-0007-01 |
Coal Gasification Supply Agreement (2.5 MB) |
 |
The Draft Coal Gasification Supply Agreement between XENERGI LTD and GOALMARKSUPERJET INT'L LTD at a fixed price of US$ 46/MT. |
XEN-0007-02 |
EPC Agreement (696 KB) |
 |
The Engineering, Procurement and Construction (EPC) Agreement between the Project Company (XENERGI) and the EPC Contractor, ISTRO ENERGO INT'L under Export Credit or Investment Credit. |
XEN-0007-03 |
Project Operations and Training Agreement - OMT (500 KB) |
 |
This OMT Agreement shall be undertaken by the EPC Contractor, IEI, to make sure that the Project shall be operated and managed sustainably in order to generated the necessary incomes for the payment back of the loan within 5 years as required. |
XEN-0007-04 |
Application for Electricity Connection Agreement (170 KB) |
 |
All tenants or registered Free Zone Entreprises uses this Form to apply for Electricity Connection at XENERGI LTD for the connection of their operations facility or property within the EFTZ. The Form can be filled, signed and send directly online. |
XEN-0007-04 |
Electricity Connection Agreement (183 KB) |
 |
After receipt and Approval of the Application for Electricity Connection, XENERGI LTD and the tenant or registered Free Zone Entreprise shall sign the Electricity Connection Agreement, which can also be filled and signed online. |
XEN-0007-05 |
Associated Electricity Supply Sevices Agreement (128 KB) |
 |
Based on the data provided by the Customer in this form, a contract on combined electricity supply services / electricity supply contract will be concluded or amended between XENERGI LIMITED and the Customer. |
8. EXPRESSION OF INTEREST (EOIs), OFFER LETTERS AND SPECIFICATIONS |
XEN-0008-01 |
Coal Offer Letter under CIF basis (646 KB) |
 |
Expression of Interest for Long term supply of coal by GoalmarkSuperjet International Ltd. under CIF basis. |
XEN-0008-02 |
Quality Specifications of the Coal (92 KB) |
 |
Coal analysis carried out by the National Geosciences Research Laboratory (NGRL) in Kaduna of the NIGERIAN GEOLOGICAL SURVEY AGENCY. This Anthracite Coal is suitable for gasification. |
9. PROJECT IMPLEMENTATION MILESTONE |
XEN-0009-01 |
APPENDIX 1 - Project Milestone (1.3 MB) |
 |
As provided in this Milestones. The implementation of this project is scheduled for a period of 12-24 Months. |