10.2 MWH INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) POWER PLANT |
Document Number |
Document Name / Size |
Download |
Description / Notes |
1. LEGAL AND FINANCIAL DOCUMENTS OF XENERGI LIMITED (PROJECT COMPANY) |
XEN-0001-01 |
Certificate of Registration (541 KB) |
 |
This Certificate of Registration show that XENERGI is a duly registered and existing Company under the Laws of Nigeria |
XEN-0001-02 |
Form CAC2A - Distribution of Shares (673 KB) |
 |
Shares of the Company's initial and actual shareholders |
XEN-0001-03 |
Form CAC7 - Particulars of Directors (1.20 MB) |
 |
Particulars of the Company's initial and actual shareholders |
XEN-0001-04 |
Memorandum and Articles of Association (966 KB) |
 |
The Company legal statement signed by the shareholders, declaring the business portfolios, objectives and manners of external affairs |
XEN-0001-05 |
Shareholding Structure of Xenergi (80 KB) |
 |
The Sharholders shall secure the Equity Contribution of 15% of the Total Investment Capital and all related bank charges. |
XEN-0001-06 |
Profile of the Project Company - XENERGI (1.10 MB) |
 |
XENERGI's Profile (including Power and related businesses) - it ownes and operates its own Gas Processing Plant in Ebendo. |
2. CONSTRUCTION LAND DOCUMENTS AND LAND TITLE (CERTIFICATE OF OCCUPANCY) |
XEN-0002-01 |
Certificate of Occupancy with EFTZ's TDP (1.20 MB) |
 |
This is the CofO (of 403.562ha of land) for the construction of the EFTZ, including the 10.2MWh IGCC Power Plant. |
XEN-0002-02 |
Land Use of the Enpower Free Trade Zone (202 KB) |
 |
ENPOWER ENERGY LIMITED is licensed by the Nigeria Export Processing Zones Authority (NEPZA) under Enpower Free Trade Zone Company (EFTZMC) to develop, build, own and operate the EFTZ. |
XEN-0002-03 |
Construction Site TDP and Coordinates (663 KB) |
 |
The land area required for the contruction of the 10.2MWh IGCC Power Plant is 1.6 ha from the Total land of 55.65 ha. There is a provision of expanding this plant up to 60 MWh on 35.30 ha. The Remaining will used for green fuel production, as an alternative fuel supply, if neccessary. |
3. PROJECT ADMINISTRATION MANUAL (PAM) |
XEN-0003-01 |
Project Administration Manual (KB) |
 |
This PAM is designed to provide the key guidelines, road map, standards, policies and regulations for the bankable and financeable implementation of the Project. |
4. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) |
XEN-0004-01 |
EIA - Interim Report ( KB) |
 |
|
XEN-0004-02 |
EIA - Full Report ( KB) |
 |
|
5. TECHNOECOCOMIC STUDIES OF THE PROJECT - FULL DOCUMENTATION |
XENI-0005-01 |
|
 |
|
6. DETAILED TECHNICAL DESIGNS OF THE PLANT (BLOCK AND CONCRETE POWERHOUSE OF ALL 14 X 1MWH IGCC BIOMASS UNITS IN 1 BLOCK |
XEN-0006-01 |
Document Name (Plant Architectural Designs) |
Download |
Description / Notes |
XEN-0006-01-1A |
Power Plant Arial View - Front (287KB) |
 |
The Top View of the Power Plant - from the Plant Front Side. |
XEN-0006-01-2B |
Power Plant Arial View - Back (270KB) |
 |
The Top View of the Power Plant - from the Plant Back Side. |
XEN-0006-01-2C |
Power Plant Arial View - Right (300KB) |
 |
The Top View of the Power Plant - from the Plant Right Side. |
XEN-0006-01-4D |
Power Plant Arial View - Left (294KB) |
 |
The Top View of the Power Plant - from the Plant Left Side. |
XEN-0006-01-5E |
Main Road - A1-IN (197KB) |
 |
This Main Road (A1-IN) is the main entry to inside the Plant. |
XEN-0006-01-6F |
Main Road - A1-OUT (197KB) |
 |
This Main Road (A1-OUT) is the main exit leading to Main Gate. |
XEN-0006-01-7G |
Administration Building and Powerhouse (219KB) |
 |
View of the Admin. Building and Powerhouse from the Main Gate. |
XEN-0006-01-8H |
Parking Area A (211KB) |
 |
This front Admin. Building Parking Area is only for the Plant Staff. |
XEN-0006-01-9I |
Parking Area B (173KB) |
 |
These three Parking Spaces are for the CEO and Top Management. |
XEN-0006-01-10J |
Powerhouse and Evacuation Sytems (200KB) |
 |
Electricity Generation Facilities and Distribution Systems. Each Unit of 1MWh is provided with its own Power Generator (Synchronous generator - MJH 800 MC6 - Marelli Motori). |
XEN-0006-01-11K |
Powerhouse Rooftop View (122KB) |
 |
This rooftop is designed for the installation of the central ventilation and cooling systems. Some Solar PV Panels can also be installed on it for additional power generation. |
XEN-0006-01-12L |
Plant Integrated Generation & Operation Facilities (200KB) |
 |
Water Storage Systems, Gas Storage Systems and Warehouses. |
XEN-0006-01-13M |
Water Storage Facilities (226KB) |
 |
Water Storage Tanks for Raw Water from Oji River and Treated Water from the Plant integrated Water Treatment Plant (WTP) for collected raw water and waste water. |
XEN-0006-01-14N |
Main Gate, Office Building and Powerhouse (212KB) |
 |
The Power Plant is designed for increased operations management efficiency and quality, enabling easy movement of staff between the Gate, Office Building and Powerhouse. |
XEN-0006-01-15O |
OFFICE for Staff - Interior View - IN (107KB) |
 |
Administration Building Office, showing the office interior, including office Desk, Shelves and Chairs. |
XEN-0006-01-16P |
OFFICE for Staff - Interior View - OUT (131KB) |
 |
Administration Building Office, showing the office interior toward office exit (view of Door, Shelves and Chairs. |
XEN-0006-01-17Q |
Admin Building FLOOR KITCHEN Interior View - IN (136KB) |
 |
Each Floor of the Admin. Building is provided with its own Kitchen. This view is showing the Kitchem interior, including Kitchen Desk, Microwaves and Dinning Table, etc. |
XEN-0006-01-18R |
Admin Building FLOOR KITCHEN Interior View - OUT (152KB) |
 |
Each Floor of the Admin. Building is provided with its own Kitchen. This view is showing the Kitchem interior, including Kitchen Desk, Microwaves, Dinning Table and Door, etc. |
XEN-0006-01-19S |
Main Gate OFFICE Interior View - IN (152KB) |
 |
Main Gate Reception Office showing Interior View from Door/Entry. |
XEN-0006-01-20T |
Main Gate OFFICE Interior View - OUT (136KB) |
 |
Main Gate Reception Office showing Interior View from Desks. |
XEN-0006-01-21U |
Powerhouse ENGINE ROOM-View - IN (139KB) |
 |
View from Engine Room Entry to the Powerhouse ENGINE ROOM. |
XEN-0006-01-22V |
Powerhouse ENGINE ROOM-View - OUT (136KB) |
 |
View from the Engine Room to the Powerhouse ENGINE ROOM exit. |
XEN-0006-02 |
Powerhouses (14 X 1 MWH Container Powerhouse) |
Download |
Description / Notes |
XEN-0006-02-1A |
Power Plant Arial View - Front (287KB) |
 |
The Top View of the Power Plant - from the Plant Front Side. |
XEN-0006-02-2B |
Power Plant Arial View - Back (270KB) |
 |
The Top View of the Power Plant - from the Plant Back Side. |
XEN-0006-02-3C |
Power Plant Arial View - Right (300KB) |
 |
The Top View of the Power Plant - from the Plant Right Side. |
XEN-0006-02-4D |
Power Plant Arial View - Left (294KB) |
 |
The Top View of the Power Plant - from the Plant Left Side. |
XEN-0006-02-5E |
Main Road - A1-IN (197KB) |
 |
This Main Road (A1-IN) is the main entry to inside the Plant. |
XEN-0006-02-6F |
Main Road - A1-OUT (197KB) |
 |
This Main Road (A1-OUT) is the main exit leading to Main Gate. |
XEN-0006-02-7H |
Administration Building and Powerhouse (219KB) |
 |
View of the Admin. Building and Powerhouse from the Main Gate. |
XEN-0006-02-8I |
Parking Area B (173KB) |
|
These three Parking Spaces are for the CEO and Top Management. |
XEN-0006-02-9J |
Powerhouse, Transfomer Stations |
|
View of the Containerised Powerhouses and Tansformer Stations. |
XEN-0006-02-10H |
Powerhouse and Building Administration |
 |
Riar view of the Containerised Powerhouses and the Admin. Building. |
XEN-0006-03 |
2D-Blocktype Powerhouse Detailed Tech. Designs |
Download |
|
XEN-0006-03B |
GENERAL SITE LAYOUT |
 |
The Powerhouse Layout with 14 Genset units of 1 MWh max. each. |
XEN-0006-03C |
SITE PLAN - Rooftop View |
 |
The location of the Biomass and MSW I. Gasification Power Plant |
XEN-0006-03D |
ADMINISTRATION BUILDING - Ground Floor Plan |
 |
Detailed design Layout of the Administration Building ground floor. |
XEN-0006-03E |
ADMINISTRATION BUILDING - First Floor Plan |
 |
Detailed design Layout of the Administration Building first floor. |
XEN-0006-03F |
ADMINISTRATION BUILDING - Second Floor Plan |
 |
Detailed design Layout of the Administration Building Second floor. |
XEN-0006-03G |
ADMINISTRATION BUILDING - Third Floor Plan |
 |
Detailed design Layout of the Administration Building Third floor. |
XEN-0006-03H |
ADMINISTRATION BUILDING - Fourth Floor Plan |
 |
Detailed design Layout of the Administration Building Fourth floor. |
XEN-0006-03I |
ADMINISTRATION BUILDING - Section A-A' |
 |
View of all floors of the Administration Building with Dimensions |
XEN-0006-03J |
MAIN GATE RECEPTION & SECURITY - Floor Plan |
 |
The 2-way Main Gate is designed for all types of ground Vehicles. |
XEN-0006-03K |
MAIN GATE RECEPTION & SECURITY - Section |
 |
This Main Gate is designed as the office of the security personnel. |
XEN-0006-03L |
ENGINE HALL - Section |
 |
The Powerhouse showing the Cooling System of the Gensets. |
XEN-0006-03M |
WAREHOUSE - Section |
 |
The Warehouse for the plant Operation Equipment and Tools. |
XEN-0006-03N |
GAS FUEL PREPARATION & TREATMENT PLANT - Section |
 |
The Biomass Storage and Gasification Plant |
XEN-0006-03O |
WATER TREATMENT PLANT - Section |
 |
This WTP collects, stores and treats the water for the Plant |
XEN-0006-02 |
GENSETS MWM TCG 3016 V12 OF 1MWel |
|
|
XEN-0006-02A |
|
 |
|
XEN-0006-02B |
|
 |
|
XEN-0006-02C |
|
 |
|
XEN-0006-02D |
|
 |
|
XEN-0006-02B |
|
 |
|
XEN-0006-04 |
COOLING TOWERS |
|
|
XEN-0006-04A |
|
 |
|
XEN-0006-04B |
|
 |
|
XEN-0006-05 |
ELECTRICAL SINGLE LINE DIAGRAM |
|
|
XEN-0006-05A |
|
 |
|
7. PROJECT AGREEMENTS |
XEN-0007-01 |
|
 |
|
XEN-0007-02 |
|
 |
|
XEN-0007-03 |
|
 |
|
XEN-0007-04 |
|
 |
|
XEN-0007-04 |
|
 |
|
XEN-0007-05 |
|
 |
|
8. EXPRESSION OF INTEREST (EOIs), OFFER LETTERS AND SPECIFICATIONS |
XEN-0008-01 |
|
 |
|
XEN-0008-02 |
|
 |
|
9. PROJECT IMPLEMENTATION MILESTONE |
XEN-0009-01 |
|
 |
|